By Arshi Chadha, Founder · Bridgeway Power
Haryana Solar Policy: DHBVN and UHBVN Consumer Guide

- •Mandatory Solar: Required for all new buildings on plots 500 sq. yds and above.
- •Subsidy: Up to ₹78,000 under PM Surya Ghar (Residential).
- •Generation: ~120 units/month per kW in Haryana.
- •Payback: 4–5 years for residential; 3 years for commercial.
- •Applicable Act: Electricity Act 2003 (Consumer Rights).
If you own a home or factory in Haryana, the "Electricity Act" isn't just a thick book of rules—it is the legal backbone that guarantees your right to generate your own power. Under the dhbvn or uhbvn electricity act framework (specifically the Electricity Act 2003 and the HERC Net Metering Regulations), you are no longer just a "consumer" of the grid; you are a "prosumer."
At Bridgeway Power, we’ve handled over 2,000 installations across the NCR, and I’ve seen the confusion firsthand. Whether you are in a solar in South City Gurgaon villa under DHBVN or a cold storage unit in Panchkula under UHBVN, the rules for connecting your panels to the grid are strict but manageable if you know the process.
DHBVN vs. UHBVN: Which Side of the Map are You On?
Haryana’s power distribution is split between two major utilities. While the Haryana Renewable Energy Department (HAREDA) sets the broad policy, the actual implementation of your net meter happens at the sub-division office of your specific DISCOM.
- DHBVN (Dakshin Haryana Bijli Vitran Nigam): Operates in the southern districts, including Gurugram, Faridabad, Hisar, Rewari, and Sirsa. Most of our high-load residential and industrial projects fall here.
- UHBVN (Uttar Haryana Bijli Vitran Nigam): Covers the northern districts like Panchkula, Ambala, Rohtak, Panipat, and Sonipat.
The technical standards for solar are identical, but the portal workflows and administrative speeds often differ.
DHBVN vs UHBVN Solar Approval Process
| Feature | DHBVN (South Haryana) | UHBVN (North Haryana) |
|---|---|---|
| Application Portal | DHBVN Solar Portal | UHBVN Rooftop Solar Portal |
| Primary Markets | Gurugram, Faridabad, Manesar | Panipat, Sonipat, Panchkula |
| Feasibility Report | Typically 7–10 days | Typically 7–12 days |
| Technical Norms | HERC Net Metering Regs 2014/2021 | HERC Net Metering Regs 2014/2021 |
| Net Meter Availability | Higher stock in GGN/FBD | Mixed; often requires private purchase |
| Common Delay | Sanctioned load mismatches | Verification of rural plot titles |
Mandatory Solar Rooftop Regulations in Haryana
If you are building a new house in Haryana, solar isn't an "option"—it's a requirement for your Occupation Certificate (OC). The Gurugram solar mandates are particularly strict because of the city's massive energy appetite.
Per the Haryana Government directives, the following categories must install rooftop solar:
- Residential Plots (500 sq. yds to 1000 sq. yds): Minimum 1 kWp or 5% of sanctioned load, whichever is higher.
- Residential Plots (1000 sq. yds and above): Minimum 2 kWp or 5% of sanctioned load.
- Private Schools/Hospitals: Mandatory solar if the sanctioned load exceeds 30 kW.
I often tell clients: don't just install the "minimum" 1 kW to get your OC. A 1 kW system only generates about 120 units a month. If you have a 1.5 Ton AC, you'll burn through that in three days. Use our Solar Calculator to see why a 5 kW or 10 kW system actually makes sense for your bill, rather than just doing a "compliance" job.
The Electricity Act: Your Legal Right to Solar
Many consumers ask if the DISCOM can "refuse" their solar application. Under the dhbvn or uhbvn electricity act framework (The Electricity Act, 2003, Section 43), the DISCOM is duty-bound to provide a connection.
More importantly, the Electricity (Rights of Consumers) Rules, 2020 mandates that:
- Net metering must be provided for loads up to 500 kW or up to the sanctioned load.
- The DISCOM cannot delay the process unnecessarily once the installation is certified by a chartered engineer or the DISCOM's own inspector.
If you are facing a delay in your UHBVN solar application, you are legally protected. The Net Metering in India rules specify timelines. If the DISCOM fails to install the meter within the stipulated period after you’ve submitted the Work Completion Report (WCR), you can approach the Consumer Grievance Redressal Forum (CGRF).
Real Example: A Gurugram Bungalow
A homeowner in solar in Palam Vihar had a sanctioned load of 12 kW and a monthly bill of ₹14,000. Under the DHBVN solar subsidy rules, they installed an 8 kW system.
- System Size: 8 kW
- Monthly Generation: ~960 Units
- Old Bill: ₹14,000
- New Bill: ~₹2,500 (Fixed charges + minimal energy use)
- Payback Period: 4.2 years
Talk to a solar engineer — not a salesperson
Check whether we install in your area, then get your answer on WhatsApp. No forms, no call centre.
What would solar save on YOUR bill?
Grievance Redressal: When the Net Meter is Delayed

The biggest bottleneck in Haryana isn't the panels; it's the meter. Sometimes the sub-division office claims they are "out of stock."
Here is what we do for our clients:
- Private Procurement: If the DISCOM doesn't have meters, you have the right to buy your own HT/LT secure meter (must be DLMS compliant and tested at the DISCOM MT lab).
- CM Window: If a net meter is pending for more than 30 days post-WCR without a valid technical reason, filing a grievance on the Haryana CM Window usually gets things moving in 72 hours.
- CGRF: For larger commercial plants, the Consumer Grievance Redressal Forum is the formal route for disputes regarding solar credit banking or billing errors.
For residents in solar in Faridabad or Gurugram, we recommend keeping a timestamped copy of your online application. The Solar Installation Process in India is heavily dependent on these paper trails.
Pricing and Subsidy (2025-2026)
Currently, Haryana follows the PM Surya Ghar Muft Bijli Yojana. There is no additional state-specific cash subsidy for residential homes beyond the central grant, but the high electricity tariffs (up to ₹7.1/unit for top slabs) make the ROI very attractive.
| System Size | Total Cost (GST Incl.) | Central Subsidy | Net Cost |
|---|---|---|---|
| 3 kW | ₹2,40,000 | ₹78,000 | ₹1,62,000 |
| 5 kW | ₹3,43,035 | ₹78,000 | ₹2,65,035 |
| 10 kW | ₹6,29,442 | ₹78,000 | ₹5,51,442 |
Note: For systems up to 3kW, you can explore low-interest financing via SBI PM Surya Ghar Loan or PNB Solar Rooftop Scheme.
Choosing the Right Structure
Haryana experiences high wind speeds during the pre-monsoon "Andhi" season. We’ve seen many cheap 18-gauge structures fly off roofs in Rohtak and Hisar. We only use heavy-duty galvanized iron (GI) or high-grade aluminum. If you are worried about roof space, read our guide on solar panel weight on roof to understand why your slab can easily handle the load.
FAQ
Does DHBVN offer a state subsidy for solar?
Currently, residential consumers in Haryana only receive the central subsidy under the PM Surya Ghar scheme (up to ₹78,000). There is no additional state-level cash top-up like in Delhi or UP. However, the savings come from the high slab rates of ₹7.1 per unit.
Can I install solar if I am a tenant in Haryana?
Yes, but you need a No Objection Certificate (NOC) from the landlord. The net meter will be linked to the existing electricity connection in the landlord's name, and the billing benefits will accrue to that account.
What is the maximum solar capacity I can install?
You can install up to 100% of your sanctioned load. If you have a 5 kW meter, you can install up to a 5 kW solar system. If you need more, you must first apply for a load enhancement with DHBVN or UHBVN.
How long does the UHBVN solar application process take?
From the day you apply online to the day the net meter is installed, it typically takes 45 to 60 days. This includes feasibility approval, installation, inspection, and meter testing.
Is net metering available for shops and industries in Haryana?
Yes, but for commercial and industrial (C&I) categories, the rules for "banking" units differ. Surplus energy is usually adjusted within the same billing cycle or financial year, depending on the current HERC tariff order.
Before you sign a contract, ensure your installer is registered on the National Portal. If you're looking for a partner who has spent 35 years navigating the quirks of solar in Delhi and Haryana, reach out for a free quote. We’ll do a site survey to check your roof health and sanctioned load before you spend a single Rupee.
Every 1 kW of solar on your roof offsets 1.5 tonnes of CO₂ per year
That's 40 trees planted — every year, for 25 years.
A typical 5 kW home system offsets 187 tonnes of carbon over its lifetime. That's equivalent to taking 8 cars off the road.
See your impact →How much can you save with solar?
Enter your electricity bill → get system size, subsidy amount & payback period
Get StartedLiked this article? Get a free solar quote
Tell us about your rooftop — we'll call with exact savings for your home.
Related Articles
Net Metering in India: How to Sell Solar Power Back to the Grid
Learn how net metering in India allows you to sell solar power back to the grid. Discover state policies, savings examples, and how to reduce your bill by 90%.
Read moreWhat Is Captive Open Access Solar (100% Equity Model)
Learn how Captive Open Access Solar (100% Equity Model) helps Indian businesses cut electricity costs by 40% using off-site solar plants. Guide on rules, savings & ROI.
Read moreSolar Installation Cost in Delhi NCR 2026: 3 kW at ₹1.32L net
Updated 2026 guide to solar costs in Delhi NCR. Learn about PM Surya Ghar subsidies, system pricing from 1kW-10kW, and how to reach zero electricity bills.
Read moreRelated guides
Delhi Electricity Rate 2026
BSES & Tata Power per-unit rates, PPAC, subsidy — sourced from DERC.
ExploreDelhi Solar Policy 2026
Free rooftop solar up to 3 kW for homes under 400 units. Eligibility & apply.
ExploreSolar Panel Price in Delhi
Live 2026 rooftop prices in Delhi after ₹1.56L subsidy. 1,200+ installs.
ExploreSolar Company in Gurgaon
Gurgaon's rooftop solar installer — 800+ systems, ₹78K PM Surya Ghar subsidy.
ExploreSolar Company in Noida
Noida & Greater Noida rooftop solar — 500+ installs, ₹1.08L stacked subsidy.
ExploreSolar Panel Price in Faridabad
Live 2026 Faridabad prices after ₹78K PM Surya Ghar subsidy. 350+ homes.
Explore