Solar Panel Price in Delhi
Live 2026 pricing for 1kW–10kW rooftop solar in Delhi — after PM Surya Ghar + Delhi state subsidy. Stop paying ₹8,000/month when your rooftop can generate it for free.

Skip the back-and-forth
Your 3 kW in Delhi: ₹97,821 after ₹1.08 L subsidy
₹2,05,821 list price · ₹78,000 central + ₹30,000 Delhi state subsidy. Drop your number — exact quote on WhatsApp in 2 min.
No spam. No call centre. One WhatsApp from a Bridgeway specialist.
Why Solar in Delhi?
₹8 → ₹1/unit
Your effective electricity cost after solar
₹1,08,000
Total subsidy — PM Surya Ghar ₹78K + Delhi ₹30K
₹3/unit GBI
Delhi pays you per unit generated (first 5 yrs)
A typical 3 kW system in Delhi costs ₹1.5–2.5 lakh after subsidy. Use our calculator
Solar Panel Price in Delhi — by System Size
Net cost after every government subsidy you qualify for in Delhi. No hidden charges.
| System | Gross Cost | Subsidy | You Pay | Units/Month |
|---|---|---|---|---|
| 1 kW | ₹76,230 | −₹40,000 | ₹36,230 | ~120 |
| 2 kW | ₹1,52,460 | −₹80,000 | ₹72,460 | ~240 |
| 3 kW | ₹2,28,690 | −₹1,08,000 | ₹1,20,690 | ~360 |
| 5 kW | ₹3,43,035 | −₹1,08,000 | ₹2,35,035 | ~600 |
| 10 kW | ₹6,30,000 | −₹1,08,000 | ₹5,22,000 | ~1200 |
1 kW System
₹36,230
2 kW System
₹72,460
3 kW System
₹1,20,690
5 kW System
₹2,35,035
10 kW System
₹5,22,000
Prices are typical residential rates inclusive of panels, inverter, structure, wiring & installation. Get exact quote for your bill
Solar Subsidies in Delhi
Here's what you can save with government incentives in Delhi
Up to ₹78,000
PM Surya Ghar (Central)
₹30,000 additional
Delhi State Subsidy
₹3/unit
GBI ≤ 3 kW (5 yrs)
₹2/unit
GBI ≤ 10 kW Residential
₹1/unit
GBI Commercial
₹2/unit
GBI RWA / Society
₹18,000/kW
RWA Society Capital Subsidy
How to Claim Solar Subsidy in Delhi
Bridgeway runs the entire process. You sign three forms and check your bank in 30–45 days.
Up to ₹1,08,000 stacked subsidy
- • PM Surya Ghar (Central): up to ₹78,000 for a 3 kW system
- • Delhi State Subsidy: ₹10,000/kW, capped at ₹30,000
- 1
Register on PM Surya Ghar portal
We file your application on pmsuryaghar.gov.in with your discom consumer number.
- 2
Discom feasibility approval
BSES / Tata Power / DHBVN / PVVNL approve your rooftop in 7–10 days.
- 3
Installation by empanelled vendor
Bridgeway is MNRE-empanelled. 2–3 days on site, certified components only.
- 4
Net meter & inspection
Discom installs the net meter and conducts safety inspection.
- 5
Plant commissioning report uploaded
We upload geo-tagged photos and the commissioning report to the portal.
- 6
Subsidy credited to your bank
Combined subsidy lands in your account in 30–45 days. Zero out-of-pocket follow-up.
How It Works
Free Site Survey
We assess your rooftop & shading
Design & Subsidy Filing
Custom design + government paperwork
Installation (2-3 days)
Professional mounting & wiring
Net Metering Activation
Start generating & saving
Your Rooftop Is Losing Money Every Month
Tell us about it — we'll show you exactly what solar saves you.