<link href="https://fonts.googleapis.com/css2?family=Inter:wght@300;400;500;600;700;800&display=optional" rel="stylesheet">
    24×7 Support

    Rooftop Solar Installation · Delhi NCR

    Your Roof. Your Power Plant.

    Save ₹2,500–₹15,000/month on electricity. Net metering filed, subsidy applied, 25-year panel warranty — we handle everything.

    Solar colony with multiple Indian homes fitted with rooftop solar panels

    Rooftop Solar Panel Cost in India

    Rooftop Solar Installation Cost Calculator

    What Size Solar System Do You Need?

    Pick your monthly electricity bill — we'll show you exactly what you need.

    System Size
    5 kW
    Roof Area
    350 sqft
    Net Cost
    ₹2.65L
    After ₹78K subsidy
    Payback
    4.5 yr
    Saving ₹4,500–6,000/mo
    Panels
    9 panels
    Total Cost
    ₹3.43L
    Govt Subsidy
    ₹78K
    You Pay
    ₹2.65L
    25-yr Savings
    ₹13.25L

    Delhi & UP residents get an additional ₹30,000 state subsidy

    On top of the ₹78,000 central subsidy under PM Surya Ghar, Delhi and Uttar Pradesh offer an extra ₹30,000 — bringing your total subsidy to ₹1,08,000.

    2026 Pricing

    Solar Panel Price in Delhi — by System Size

    Net cost after every government subsidy you qualify for in Delhi. No hidden charges.

    Verified 21 Jun 2026 · WhatsApp pricing sheet 2026-06-10 (String+1Ph<=5kW, String+3Ph>=6kW, GST-incl)Verified 10 Jul 2026 · Delhi govt solar policy

    1 kW System

    ₹36,230

    Gross ₹76,230 − subsidy ₹40,000~120 units/mo

    2 kW System

    ₹72,460

    Gross ₹1,52,460 − subsidy ₹80,000~240 units/mo

    3 kW System

    ₹1,20,690

    Gross ₹2,28,690 − subsidy ₹1,08,000~360 units/mo

    5 kW System

    ₹2,35,035

    Gross ₹3,43,035 − subsidy ₹1,08,000~600 units/mo

    10 kW System

    ₹5,22,000

    Gross ₹6,30,000 − subsidy ₹1,08,000~1200 units/mo

    Prices are typical residential rates inclusive of panels, inverter, structure, wiring & installation. Get exact quote for your bill

    Everything's Included — No Surprises

    Every installation comes with end-to-end project management.

    Site Survey + Shadow Analysis

    3D shading simulation to maximise generation

    MNRE-Approved Panels + Inverter

    Tier-1 mono PERC panels, BIS-certified inverter

    Complete ACDB/DCDB + Earthing

    LA-rated protection, dual earthing as per IS/IEC

    Net Metering Application

    We file the paperwork — DISCOM portal + subsidy

    DISCOM Inspection Coordination

    We handle the inspector visit and meter swap

    5-Year Comprehensive Warranty

    Panels, inverter, mounting — everything covered

    From Survey to Switch-On

    Total timeline: 4–8 weeks. Most of the wait is DISCOM processing.

    1

    Site Survey + Design

    2–3 days

    Engineer visits, measures roof, checks shading, recommends system size.

    2

    Installation

    1–2 days

    Panels mounted, inverter wired, ACDB/DCDB connected, earthing done.

    3

    Net Meter Application

    2–4 weeks

    We file with your DISCOM + PM Surya Ghar subsidy portal on your behalf.

    4

    DISCOM Approval + Commissioning

    2–3 weeks

    Inspector visits, bi-directional meter installed, system goes live.

    Got Questions? We've Got Answers.

    Your Rooftop Is Losing Money Every Month

    Tell us about it — we'll show you exactly what solar saves you.

    We use this to confirm we serve your area.