24×7 Support
    800+ systems in Gurgaon

    Solar Panel Price in Gurgaon

    Live 2026 pricing for 3 kW to 20 kW rooftop solar across Gurgaon — from Sector builder floors to DLF and Sushant Lok villas. We run DHBVN net metering and the ₹78,000 PM Surya Ghar subsidy end to end. Haryana has no state subsidy, so we quote the honest central-only math — not an inflated ₹1L+ stack.

    Comparing installers first? How to choose a solar company in Delhi NCR

    Solar installation on rooftops in Gurgaon, Haryana

    Skip the back-and-forth

    Your 3 kW in Gurgaon: ₹1.28 L after ₹78,000 subsidy

    ₹2,05,821 list price · ₹78,000 central subsidy. Drop your number — exact quote on WhatsApp in 2 min.

    +91

    No spam. No call centre. One WhatsApp from a Bridgeway specialist.

    Why Solar in Gurgaon?

    ₹7–8/unit

    DHBVN tariff — among the highest residential rates in NCR

    ₹78,000

    PM Surya Ghar central subsidy (Haryana adds no state top-up)

    10–20 kW

    Load-matched systems for DLF & Sushant Lok villas

    A typical 3–20 kW system in Gurgaon costs ₹1.6–11.9 lakh after subsidy. Use our calculator

    What Gurgaon Actually Pays for Power

    Solar only makes sense against your real per-unit cost — not a national average. Here is the grid you are actually billed on in Gurgaon.

    Your discom in Gurgaon

    • DHBVN (Dakshin Haryana Bijli Vitran Nigam)

    Gurgaon runs entirely on DHBVN. Net metering is filed at the sub-division office with a ₹1,000 meter fee; Bridgeway handles the application, inspection and meter swap.

    Haryana domestic slabs

    Monthly consumptionEnergy charge
    First 50 units₹2.20/unit
    51–100 units₹2.70/unit
    101–150 units₹2.95/unit
    151–300 units₹5.25/unit
    301–500 units₹6.45/unit
    Above 500 units₹7.10/unit
    • +Fuel Surcharge Adjustment (FSA): ₹0.47/unit
    • +Electricity duty: ₹0.10/unit

    A high-usage Gurgaon home effectively pays about ₹7.67/unit on its top slab — before fixed charges and taxes.

    Verified 1 Apr 2026 · BSES/PVVNL/DHBVN tariff schedules 2025-26

    A real Bridgeway install in Delhi NCR

    20 kW
    ₹17,500 → ₹0monthly bill, before → after

    Running 6 years

    Field engineer attended the complaint promptly. Service has always been prompt and professional.

    Indrabhooti Barar · Delhi NCR

    2026 Pricing

    Solar Panel Price in Gurgaon — by System Size

    Net cost after every government subsidy you qualify for in Haryana. No hidden charges.

    Verified 21 Jun 2026 · WhatsApp pricing sheet 2026-06-10 (String+1Ph<=5kW, String+3Ph>=6kW, GST-incl)Verified 2 Jul 2026 · Haryana govt

    1 kW System

    ₹46,230

    Gross ₹76,230 − subsidy ₹30,000~120 units/mo

    2 kW System

    ₹92,460

    Gross ₹1,52,460 − subsidy ₹60,000~240 units/mo

    3 kW System

    ₹1,50,690

    Gross ₹2,28,690 − subsidy ₹78,000~360 units/mo

    5 kW System

    ₹2,65,035

    Gross ₹3,43,035 − subsidy ₹78,000~600 units/mo

    10 kW System

    ₹5,52,000

    Gross ₹6,30,000 − subsidy ₹78,000~1200 units/mo

    Prices are typical residential rates inclusive of panels, inverter, structure, wiring & installation. Get exact quote for your bill

    Central & State Incentives

    Solar Subsidies in Gurgaon

    Here's what you can save with government incentives in Haryana

    Up to ₹78,000

    PM Surya Ghar (Central)

    40% Year 1

    Accelerated Depreciation (Commercial)

    Free Filing

    DHBVN Net Metering

    How to Claim Solar Subsidy in Gurgaon

    Bridgeway runs the entire process. You sign three forms and check your bank in 30–45 days.

    Up to ₹78,000 central subsidy

    • • PM Surya Ghar (Central): up to ₹78,000 for a 3 kW system
    1. 1

      Register on PM Surya Ghar portal

      We file your application on pmsuryaghar.gov.in with your discom consumer number.

    2. 2

      Discom feasibility approval

      BSES / Tata Power / DHBVN / PVVNL approve your rooftop in 7–10 days.

    3. 3

      Installation by empanelled vendor

      Bridgeway is MNRE-empanelled. 2–3 days on site, certified components only.

    4. 4

      Net meter & inspection

      Discom installs the net meter and conducts safety inspection.

    5. 5

      Plant commissioning report uploaded

      We upload geo-tagged photos and the commissioning report to the portal.

    6. 6

      Subsidy credited to your bank

      Combined subsidy lands in your account in 30–45 days. Zero out-of-pocket follow-up.

    How It Works

    1

    Free Site Survey

    We assess your rooftop & shading

    2

    Design & Subsidy Filing

    Custom design + government paperwork

    3

    Installation (2-3 days)

    Professional mounting & wiring

    4

    Net Metering Activation

    Start generating & saving

    25-Year Warranty·MNRE Empanelled·800+ Installations in Gurgaon·Net Metering Filed

    Your Rooftop Is Losing Money Every Month

    Tell us about it — we'll show you exactly what solar saves you.

    We use this to confirm we serve your area.

    Solar FAQs for Gurgaon

    Get Gurgaon Quote on WhatsApp