Solar Panel Price in Faridabad
Live 2026 pricing for 1kW–10kW rooftop solar in Faridabad — after PM Surya Ghar subsidy. Start saving ₹5,000+/month with rooftop solar.
Comparing installers first? How to choose a solar company in Delhi NCR

Skip the back-and-forth
Your 3 kW in Faridabad: ₹1.28 L after ₹78,000 subsidy
₹2,05,821 list price · ₹78,000 central subsidy. Drop your number — exact quote on WhatsApp in 2 min.
No spam. No call centre. One WhatsApp from a Bridgeway specialist.
Why Solar in Faridabad?
₹6-7/unit → ₹1
Your effective electricity cost after solar
₹78,000 subsidy
PM Surya Ghar central subsidy for your home
4-5 yr payback
Then 20+ years of free electricity
A typical 3–5 kW system in Faridabad costs ₹1.6–2.7 lakh after subsidy. Use our calculator
What Faridabad Actually Pays for Power
Solar only makes sense against your real per-unit cost — not a national average. Here is the grid you are actually billed on in Faridabad.
Your discom in Faridabad
- DHBVN (Dakshin Haryana Bijli Vitran Nigam)
Faridabad is a DHBVN circle. Same HERC tariff schedule as Gurgaon, same net-metering route — Bridgeway files it end-to-end.
Haryana domestic slabs
| Monthly consumption | Energy charge |
|---|---|
| First 50 units | ₹2.20/unit |
| 51–100 units | ₹2.70/unit |
| 101–150 units | ₹2.95/unit |
| 151–300 units | ₹5.25/unit |
| 301–500 units | ₹6.45/unit |
| Above 500 units | ₹7.10/unit |
- +Fuel Surcharge Adjustment (FSA): ₹0.47/unit
- +Electricity duty: ₹0.10/unit
A high-usage Faridabad home effectively pays about ₹7.67/unit on its top slab — before fixed charges and taxes.
A real Bridgeway install in Delhi NCR
Running 2 years
Staff bahut badhiya. I have already sent a referral.
Mukesh Jain · Delhi NCR
Solar Panel Price in Faridabad — by System Size
Net cost after every government subsidy you qualify for in Haryana. No hidden charges.
| System | Gross Cost | Subsidy | You Pay | Units/Month |
|---|---|---|---|---|
| 1 kW | ₹76,230 | −₹30,000 | ₹46,230 | ~120 |
| 2 kW | ₹1,52,460 | −₹60,000 | ₹92,460 | ~240 |
| 3 kW | ₹2,28,690 | −₹78,000 | ₹1,50,690 | ~360 |
| 5 kW | ₹3,43,035 | −₹78,000 | ₹2,65,035 | ~600 |
| 10 kW | ₹6,30,000 | −₹78,000 | ₹5,52,000 | ~1200 |
1 kW System
₹46,230
2 kW System
₹92,460
3 kW System
₹1,50,690
5 kW System
₹2,65,035
10 kW System
₹5,52,000
Prices are typical residential rates inclusive of panels, inverter, structure, wiring & installation. Get exact quote for your bill
Solar Subsidies in Faridabad
Here's what you can save with government incentives in Haryana
Up to ₹78,000
PM Surya Ghar (Central)
40% Year 1
Accelerated Depreciation (Commercial)
Free Filing
DHBVN Net Metering
How to Claim Solar Subsidy in Faridabad
Bridgeway runs the entire process. You sign three forms and check your bank in 30–45 days.
Up to ₹78,000 central subsidy
- • PM Surya Ghar (Central): up to ₹78,000 for a 3 kW system
- 1
Register on PM Surya Ghar portal
We file your application on pmsuryaghar.gov.in with your discom consumer number.
- 2
Discom feasibility approval
BSES / Tata Power / DHBVN / PVVNL approve your rooftop in 7–10 days.
- 3
Installation by empanelled vendor
Bridgeway is MNRE-empanelled. 2–3 days on site, certified components only.
- 4
Net meter & inspection
Discom installs the net meter and conducts safety inspection.
- 5
Plant commissioning report uploaded
We upload geo-tagged photos and the commissioning report to the portal.
- 6
Subsidy credited to your bank
Combined subsidy lands in your account in 30–45 days. Zero out-of-pocket follow-up.
How It Works
Free Site Survey
We assess your rooftop & shading
Design & Subsidy Filing
Custom design + government paperwork
Installation (2-3 days)
Professional mounting & wiring
Net Metering Activation
Start generating & saving
Your Rooftop Is Losing Money Every Month
Tell us about it — we'll show you exactly what solar saves you.