Solar Panel Price in Ghaziabad
Live 2026 pricing for 1kW–10kW rooftop solar in Ghaziabad — after PM Surya Ghar + UP state subsidy. Cut your electricity bill by up to 80%.

Skip the back-and-forth
Your 3 kW in Ghaziabad: ₹97,821 after ₹1.08 L subsidy
₹2,05,821 list price · ₹78,000 central + ₹30,000 Uttar Pradesh state subsidy. Drop your number — exact quote on WhatsApp in 2 min.
No spam. No call centre. One WhatsApp from a Bridgeway specialist.
Why Solar in Ghaziabad?
₹5-7/unit → ₹1
Your effective electricity cost after solar
₹1,08,000
Total subsidy — PM Surya Ghar ₹78K + UP ₹30K
3-4 yr payback
Then 20+ years of free electricity
A typical 3 kW system in Ghaziabad costs ₹1.5–2.5 lakh after subsidy. Use our calculator
Solar Panel Price in Ghaziabad — by System Size
Net cost after every government subsidy you qualify for in Uttar Pradesh. No hidden charges.
| System | Gross Cost | Subsidy | You Pay | Units/Month |
|---|---|---|---|---|
| 1 kW | ₹76,230 | −₹60,000 | ₹16,230 | ~120 |
| 2 kW | ₹1,52,460 | −₹90,000 | ₹62,460 | ~240 |
| 3 kW | ₹2,28,690 | −₹1,08,000 | ₹1,20,690 | ~360 |
| 5 kW | ₹3,43,035 | −₹1,08,000 | ₹2,35,035 | ~600 |
| 10 kW | ₹6,30,000 | −₹1,08,000 | ₹5,22,000 | ~1200 |
1 kW System
₹16,230
2 kW System
₹62,460
3 kW System
₹1,20,690
5 kW System
₹2,35,035
10 kW System
₹5,22,000
Prices are typical residential rates inclusive of panels, inverter, structure, wiring & installation. Get exact quote for your bill
Solar Subsidies in Ghaziabad
Here's what you can save with government incentives in Uttar Pradesh
Up to ₹78,000
PM Surya Ghar (Central)
₹30,000 additional
UP State Subsidy
Free Filing
PVVNL Net Metering
How to Claim Solar Subsidy in Ghaziabad
Bridgeway runs the entire process. You sign three forms and check your bank in 30–45 days.
Up to ₹1,08,000 stacked subsidy
- • PM Surya Ghar (Central): up to ₹78,000 for a 3 kW system
- • UP State Subsidy: flat ₹30,000 for residential rooftop
- 1
Register on PM Surya Ghar portal
We file your application on pmsuryaghar.gov.in with your discom consumer number.
- 2
Discom feasibility approval
BSES / Tata Power / DHBVN / PVVNL approve your rooftop in 7–10 days.
- 3
Installation by empanelled vendor
Bridgeway is MNRE-empanelled. 2–3 days on site, certified components only.
- 4
Net meter & inspection
Discom installs the net meter and conducts safety inspection.
- 5
Plant commissioning report uploaded
We upload geo-tagged photos and the commissioning report to the portal.
- 6
Subsidy credited to your bank
Combined subsidy lands in your account in 30–45 days. Zero out-of-pocket follow-up.
How It Works
Free Site Survey
We assess your rooftop & shading
Design & Subsidy Filing
Custom design + government paperwork
Installation (2-3 days)
Professional mounting & wiring
Net Metering Activation
Start generating & saving
Your Rooftop Is Losing Money Every Month
Tell us about it — we'll show you exactly what solar saves you.