<link href="https://fonts.googleapis.com/css2?family=Inter:wght@300;400;500;600;700;800&display=optional" rel="stylesheet">
    24×7 Support

    Delhi · Residential · 10 kW

    10 kW Solar Panel Price in Delhi (2026)

    ₹5.22L after ₹108k stacked subsidy. BSES Rajdhani / BSES Yamuna / Tata Power-DDL net metering filed. 18 × 580 Wp panels, ~650 sqft of roof.

    Verified 21 Jun 2026 · WhatsApp pricing sheet 2026-06-10 (String+1Ph<=5kW, String+3Ph>=6kW, GST-incl)Verified 10 Jul 2026 · Delhi govt solar policy
    10 kW rooftop solar system installed in Delhi

    10 kW in Delhi means you're past every residential sanctioned-load default and into a 3-phase connection. Eighteen 580 Wp panels need ~650 sqft of clean roof, which is realistic on independent builder floors in South/West Delhi but not on standard 100 sq yd plots. Net metering still applies 1:1 up to sanctioned load under DERC rules, so the payback math holds. PM Surya Ghar caps at ₹78,000 — the marginal panels above 3 kW are unsubsidised, but cost-per-kW drops at this scale so you're still 7-9% better off per kW than a 3 kW system.

    Panels

    18 × 580 Wp

    Roof Area

    ~650 sqft

    Daily Output

    40 units

    Monthly Saving

    ₹9,600

    at ₹8/unit

    10 kW Price Breakdown — Delhi

    From gross system cost to what you actually pay.

    Gross system cost (10 kW × ₹63,000/kW)

    ₹6,30,000

    − PM Surya Ghar central subsidy

    −₹78,000

    − Delhi state subsidy

    −₹30,000

    Net cost in Delhi

    ₹5,22,000

    Payback ~4.5 years at Delhi's avg ₹8/unit residential tariff.

    DISCOM Rules

    10 kW with BSES Rajdhani / BSES Yamuna / Tata Power-DDL

    The discom-specific rules that decide whether your 10 kW system gets approved.

    Net Metering Policy

    DERC allows 1:1 net metering up to your sanctioned load. Export above sanctioned load is permitted under net-billing, not full net-metering.

    DERC Net Metering Regulations, 2014 (amended 2019)

    Sanctioned Load Rule

    Your rooftop kW cannot exceed sanctioned load without a load-enhancement application to BSES/TPDDL first. We check this before quoting.

    Applies to all rooftop sizes including 10 kW

    Delhi State Subsidy

    Delhi state top-up of ₹10,000/kW (capped ₹30,000) stacks on PM Surya Ghar. Listed Delhi cabinet approval, currently being disbursed.

    Verified for 10 kW in Delhi

    The 10 kW gotcha in Delhi

    10 kW needs a 3-phase connection. If you're on single-phase, factor in a ₹15-25k DISCOM upgrade fee.

    From our recent installs

    Is 10 kW right for your home?

    Household profile

    Large independent house, builder floor with multiple ACs

    Current monthly bill

    ₹7,500 – ₹12,000

    Inverter sizing

    10 kVA 3-phase

    Roof context: Delhi rooftops are tight: parapet shadows, water tanks and chajja overhangs eat usable area. We design around 200-450 sqft of clean roof.

    10 kW in Delhi — FAQs