Residential · 3 kW
3 kW Solar Panel Price in India (2026)
From ₹1.21L in Delhi & UP after ₹1.08L subsidy. From ₹1.51L in Haryana after ₹78K. Net metering filed, 25-year panel warranty.

What Fits in 3 kW
A 2–3 BHK with one or two ACs running 6–8 hours.
3 kW Price Breakdown
From gross system cost to what you actually pay.
Gross system cost (3 kW × ₹76,230/kW)
₹2,28,690
− PM Surya Ghar central subsidy
−₹78,000
− Delhi state subsidy
−₹30,000
Net cost in Delhi / UP
₹1,20,690
Haryana / Rajasthan have no state top-up — net cost there is ₹1.51L.
3 kW Solar Price by City
Net cost after every subsidy you qualify for. No hidden charges.
| City | DISCOM | Total Subsidy | You Pay | Details |
|---|---|---|---|---|
| Delhi | BSES / TPDDL | −₹1,08,000 | ₹1,20,690 | View |
| Noida | PVVNL | −₹1,08,000 | ₹1,20,690 | View |
| Ghaziabad | PVVNL | −₹1,08,000 | ₹1,20,690 | View |
| Gurgaon | DHBVN | −₹78,000 | ₹1,50,690 | View |
| Faridabad | DHBVN | −₹78,000 | ₹1,50,690 | View |
Delhi
₹1,20,690
BSES / TPDDL · subsidy ₹1,08,000
Noida
₹1,20,690
PVVNL · subsidy ₹1,08,000
Ghaziabad
₹1,20,690
PVVNL · subsidy ₹1,08,000
Gurgaon
₹1,50,690
DHBVN · subsidy ₹78,000
Faridabad
₹1,50,690
DHBVN · subsidy ₹78,000
Prices include panels, inverter, structure, wiring, installation & subsidy filing. Get exact quote
From Survey to Switch-On
Total timeline: 4–8 weeks. Most of the wait is DISCOM processing.
Site Survey + Design
2–3 daysEngineer visits, measures your 200 sqft, checks shading, finalises 5-panel layout.
Installation
1–2 days5 × 600 Wp panels mounted, inverter wired, ACDB/DCDB connected, earthing done.
Net Meter Application
2–4 weeksWe file with your DISCOM + PM Surya Ghar subsidy portal on your behalf.
DISCOM Approval + Commissioning
2–3 weeksInspector visits, bi-directional meter installed, your 3 kW system goes live.
3-Year Money Math
If your monthly bill is ₹2,500–3,000, here's what 3 kW does to it.
After month 42, every unit your system generates is pure savings for the next ~21 years of the panel warranty. PSU bank loans (SBI / Union / Canara) under PM Surya Ghar offer 7-year EMIs at 10–10.5%; on 3 kW that's roughly ₹1,800/month — often less than your current bill.
3 kW Solar — FAQs
Learn More About 3 kW Solar

How Rooftop Solar Can Eliminate Your Electricity Bill
Discover how Net Metering and PM Surya Ghar subsidies can reduce your monthly electricity bill to near-zero. Learn about
Read more
Solar Subsidy in Uttar Pradesh 2026: ₹1,08,000 for Noida, Ghaziabad & Greater Noida
UP's stacked solar subsidy 2026: ₹78,000 central + ₹30,000 UPNEDA state top-up = ₹1.08L. Real PVVNL net-cost math for No
Read more
दिल्ली में Solar Subsidy 2026: ₹1,08,000 Stacked + GBI
दिल्ली की 2026 stacked solar सब्सिडी: ₹78,000 केंद्र + ₹30,000 राज्य + 5 साल GBI। BSES, TPDDL & NDMC उपभोक्ताओं के लिए अ
Read moreKeep exploring
2 kW Solar Price in Delhi
2 kW system price in Delhi after PM Surya Ghar + state subsidy.
Explore3 kW Solar Price in Delhi
3 kW system price in Delhi after PM Surya Ghar + state subsidy.
Explore2 kW Solar Price in Faridabad
2 kW system price in Faridabad after PM Surya Ghar + state subsidy.
Explore3 kW Solar Price in Faridabad
3 kW system price in Faridabad after PM Surya Ghar + state subsidy.
Explore2 kW Solar Price in Ghaziabad
2 kW system price in Ghaziabad after PM Surya Ghar + state subsidy.
Explore3 kW Solar Price in Ghaziabad
3 kW system price in Ghaziabad after PM Surya Ghar + state subsidy.
ExploreYour Rooftop Is Losing Money Every Month
Tell us about it — we'll show you exactly what solar saves you.