    Ghaziabad · Residential · 3 kW

    3 kW Solar Panel Price in Ghaziabad (2026)

    ₹1.21L after ₹108k stacked subsidy. PVVNL (UPPCL) net metering filed. 5 × 580 Wp panels, ~200 sqft of roof.

    Verified 21 Jun 2026 · WhatsApp pricing sheet 2026-06-10 (String+1Ph<=5kW, String+3Ph>=6kW, GST-incl)Verified 2 Jul 2026 · UPNEDA
    3 kW rooftop solar system installed in Ghaziabad

    3 kW is the popular size in Ghaziabad for 2-3 BHK independent floors with ₹2,500-3,500 monthly bills. Five 580 Wp panels, ~200 sqft of roof, ~360 units a month. Sits cleanly under UPERC's 10 kW residential net-metering cap, so 1:1 export applies. PM Surya Ghar pays the full ₹78,000 and UP adds ₹30,000 via the unified portal — no separate UPNEDA filing required. PVVNL's net-metering desk processes 3 kW applications in 3-5 weeks, slower than Delhi DISCOMs but predictable.

    Panels

    5 × 580 Wp

    Roof Area

    ~200 sqft

    Daily Output

    12 units

    Monthly Saving

    ₹2,520

    at ₹7/unit

    3 kW Price Breakdown — Ghaziabad

    From gross system cost to what you actually pay.

    Gross system cost (3 kW × ₹76,230/kW)

    ₹2,28,690

    − PM Surya Ghar central subsidy

    −₹78,000

    − Uttar Pradesh state subsidy

    −₹30,000

    Net cost in Ghaziabad

    ₹1,20,690

    Payback ~4 years at Ghaziabad's avg ₹7/unit residential tariff.

    DISCOM Rules

    3 kW with PVVNL (UPPCL)

    The discom-specific rules that decide whether your 3 kW system gets approved.

    Net Metering Policy

    UPERC allows 1:1 net metering up to 10 kW for residential rooftops. Systems above 10 kW move to gross-metering, which changes the payback math significantly.

    UPERC (Rooftop Solar PV Grid Interactive Systems) Regulations, 2019

    Sanctioned Load Rule

    PVVNL caps rooftop capacity at sanctioned load. Load enhancement takes 2-3 weeks and a one-time security deposit.

    Applies to all rooftop sizes including 3 kW

    Uttar Pradesh State Subsidy

    UP state top-up of ₹30,000 (flat) stacks on PM Surya Ghar via the unified PM Surya Ghar portal — no separate application.

    Verified for 3 kW in Ghaziabad

    The 3 kW gotcha in Ghaziabad

    PVVNL requires the bidirectional meter to be procured from their empanelled vendor list. Don't buy it yourself.

    From our recent installs

    Is 3 kW right for your home?

    Household profile

    2-3 BHK with 1-2 ACs running 6-8 hours

    Current monthly bill

    ₹2,200 – ₹3,500

    Inverter sizing

    3 kVA single-phase

    Roof context: Ghaziabad plots are more open than central Delhi — independent houses commonly have 500-1200 sqft of usable roof, so 5-10 kW is realistic.

    3 kW in Ghaziabad — FAQs