<link href="https://fonts.googleapis.com/css2?family=Inter:wght@300;400;500;600;700;800&display=optional" rel="stylesheet">
    24×7 Support

    Faridabad · Residential · 2 kW

    2 kW Solar Panel Price in Faridabad (2026)

    ₹92,460 after ₹60k stacked subsidy. DHBVN net metering filed. 4 × 580 Wp panels, ~140 sqft of roof.

    Verified 21 Jun 2026 · WhatsApp pricing sheet 2026-06-10 (String+1Ph<=5kW, String+3Ph>=6kW, GST-incl)Verified 2 Jul 2026 · Haryana govt
    2 kW rooftop solar system installed in Faridabad

    2 kW is the entry-point Faridabad system — fits compact 2 BHK builder floors and small independent plots with ₹1,500-2,200 monthly bills. DHBVN's Faridabad division is slower than Gurgaon for paperwork but predictable: 3-4 weeks for 2 kW net-metering approval. PM Surya Ghar pays ₹60,000. Haryana has no state top-up. Four 580 Wp panels, ~140 sqft of clean roof. At this size, no structural review concerns even in older NIT Faridabad sectors.

    Panels

    4 × 580 Wp

    Roof Area

    ~140 sqft

    Daily Output

    8 units

    Monthly Saving

    ₹1,680

    at ₹7/unit

    2 kW Price Breakdown — Faridabad

    From gross system cost to what you actually pay.

    Gross system cost (2 kW × ₹76,230/kW)

    ₹1,52,460

    − PM Surya Ghar central subsidy

    −₹60,000

    − Haryana state subsidy

    −₹0

    Net cost in Faridabad

    ₹92,460

    Payback ~4.6 years at Faridabad's avg ₹7/unit residential tariff.

    DISCOM Rules

    2 kW with DHBVN

    The discom-specific rules that decide whether your 2 kW system gets approved.

    Net Metering Policy

    Same DHBVN process as Gurgaon under HERC 2021: 1:1 net metering up to sanctioned load, monthly settlement with annual surplus carry-forward.

    HERC (Rooftop Solar Grid Interactive Systems) Regulations, 2021

    Sanctioned Load Rule

    DHBVN Faridabad division is slower on load enhancement than Gurgaon (3-4 weeks vs 2). We pre-file Form A-2 alongside the net-meter application to compress the timeline.

    Applies to all rooftop sizes including 2 kW

    Haryana State Subsidy

    Haryana state subsidy is ₹0 as of 2026 — only the central PM Surya Ghar amount applies in DHBVN areas.

    Verified for 2 kW in Faridabad

    The 2 kW gotcha in Faridabad

    DHBVN Faridabad division is slower than DHBVN Gurgaon — budget an extra week on the net-metering timeline.

    From our recent installs

    Is 2 kW right for your home?

    Household profile

    1 BHK or 2 BHK with light AC use

    Current monthly bill

    ₹1,500 – ₹2,200

    Inverter sizing

    2 kVA single-phase

    Roof context: Older Faridabad sectors (15-21, NIT) were built in the 1990s and frequently fail structural review above 5 kW without retrofit. Sectors 80-89 and Greater Faridabad are newer and clear easily.

    2 kW in Faridabad — FAQs