<link href="https://fonts.googleapis.com/css2?family=Inter:wght@300;400;500;600;700;800&display=optional" rel="stylesheet">
    24×7 Support
    DHBVN · Independent villas & builder floors

    Solar Panel Installation in DLF Phase 1, Gurugram

    Save up to 90% on your electricity bill with rooftop solar. Get ₹78,000 in government subsidies. DHBVN net metering included.

    Solar installation on rooftops in DLF Phase 1, Gurugram

    ₹78,000

    Total Subsidy

    ₹7/unit

    DHBVN Tariff

    Up to 90%

    Savings on Bill

    ~₹1,27,821*

    Net Cost (3 kW)

    Net Metering in DLF Phase 1

    DHBVN

    DHBVN serves DLF Phase 1. Premium villas with large terraces are perfect for 5-10kW solar systems — many residents save ₹6,000-12,000/month.

    Average tariff: ₹7/unit
    Central subsidy: ₹78,000
    Housing type: Independent villas & builder floors

    Solar FAQs for DLF Phase 1

    How much does solar cost in DLF Phase 1, Gurugram?

    A typical 3 kW rooftop solar system in DLF Phase 1 costs around ₹2,05,821 before subsidy. After the ₹78,000 government subsidy (₹78K central), your net cost is approximately ₹1,27,821. Use our calculator for an exact estimate based on your electricity bill.

    Which DISCOM handles net metering in DLF Phase 1?

    DHBVN handles electricity distribution and net metering applications in DLF Phase 1. DHBVN serves DLF Phase 1. Premium villas with large terraces are perfect for 5-10kW solar systems — many residents save ₹6,000-12,000/month. Bridgeway Power handles the entire net metering application process for you.

    How much can I save with solar in DLF Phase 1?

    With a 3 kW system and DHBVN's average tariff of ₹7/unit, homeowners typically save ₹1,500–4,000/month depending on their electricity consumption. Use our Solar Calculator for an exact estimate based on your bill.

    Is my independent villas & builder floors in DLF Phase 1 suitable for solar?

    Yes! DLF Phase 1 is primarily independent villas & builder floors, which are ideal for rooftop solar. You need at least 100 sq ft of shadow-free roof area per kW. Bridgeway Power offers a free site survey to assess your exact rooftop potential.

    Go Solar in DLF Phase 1

    Get a free site survey and custom quote for your rooftop in DLF Phase 1, Gurugram.

    We use this to confirm we serve your area.