₹78,000
Govt. subsidy
₹7/unit
DHBVN tariff
Up to 90%
Lower bills
~₹1.51 L
Net cost · 3 kW*
Solar panel price in DLF Phase 3
A 3 kW rooftop system in DLF Phase 3 costs about ₹2,28,690 before subsidy and ₹1,50,690 after the central subsidy (Haryana adds no state subsidy).
1 kW
₹76,230 − ₹30,000 subsidy · ~120 units/mo
₹46,230
2 kW
₹1,52,460 − ₹60,000 subsidy · ~240 units/mo
₹92,460
3 kW
₹2,28,690 − ₹78,000 subsidy · ~360 units/mo
₹1,50,690
5 kW
₹3,43,035 − ₹78,000 subsidy · ~600 units/mo
₹2,65,035
10 kW
₹6,30,000 − ₹78,000 subsidy · ~1200 units/mo
₹5,52,000
Typical residential price incl. panels, inverter, structure, wiring and installation.
Net Metering in DLF Phase 3
DHBVN
DHBVN serves DLF Phase 3. Independent floors net-meter on the owner's connection; condominiums such as Silver Oaks and Ridgewood use a society plant or virtual net metering via the RWA. Bridgeway has installed across DLF Phase 3.
What solar in DLF Phase 3 actually involves
Area-specific notes from our surveys here — not a generic checklist.
DHBVN — Gurugram (Sub-Urban) sub-division, DLF Phase 3 / Moulsari Avenue feeder
DHBVN
The permission route in Phase 3 turns on the address. An independent floor is filed against the owner's own DHBVN connection with no third party involved. A condominium roof is common area, so it needs the RWA or the apartment-owners' association to consent in writing and it runs as a society-level plant or virtual net metering — Bridgeway arranges that association approval alongside the DHBVN application.
Roofs in DLF Phase 3
DLF Phase 3 is the mixed pocket: independent builder floors along Moulsari Avenue sit next to a large stock of condominiums — Silver Oaks, Ridgewood, Beverly Park, Wellington Estate, Windsor Court. That split decides everything, because an independent floor has an owner-controlled terrace that takes a straightforward 3–8 kW roof mount, whereas the condominium towers share one common terrace and cannot be net-metered flat by flat. Bridgeway has installed across DLF Phase 3, so at survey we first establish which of the two an address is and quote the matching structure rather than assuming a private roof.
A real Bridgeway install in Delhi NCR
Running 5 years · Micro-inverter
In the complex world of false promises, I can confidently say Bridgeway delivers.
Varun Kaushal · Delhi NCR
Questions we get asked here
Solar FAQs for DLF Phase 3
How much does solar cost in DLF Phase 3, Gurugram?
A typical 3 kW rooftop solar system in DLF Phase 3 costs about ₹2,28,690 before subsidy.
After the ₹78,000 central subsidy (Haryana adds no state subsidy), you pay about ₹1,50,690. Use our calculator for an exact estimate based on your electricity bill.
Which DISCOM handles net metering in DLF Phase 3?
DHBVN supplies electricity and processes net metering in DLF Phase 3.
The file goes to DHBVN — Gurugram (Sub-Urban) sub-division, DLF Phase 3 / Moulsari Avenue feeder. Bridgeway prepares the application, attends the inspection and follows up until the net meter is installed.
How much can I save with solar in DLF Phase 3?
It depends on how many units you use and when. A 3 kW system makes about 350 units a month, and DHBVN's average tariff here is ₹7/unit.
Enter your bill in our Solar Calculator to see your own savings rather than a range.
Is a home like mine in DLF Phase 3 suitable for solar?
Most homes in DLF Phase 3 are independent builder floors & condominiums, and a flat, shadow-free terrace is what matters.
You need about 100 sq ft of clear roof per kW. Bridgeway's free site survey checks your exact terrace, shading and slab before any quote.
Can solar be installed on a DLF Phase 3 condominium like Silver Oaks or Ridgewood?
Yes, but not as an individual flat rooftop — the condominium terrace is common area.
The workable route is a society-level plant or virtual net metering set up with the apartment-owners' association's consent, and Bridgeway coordinates that association approval together with the DHBVN paperwork for DLF Phase 3.
What is the solar route for an independent floor versus a condominium in DLF Phase 3?
For an independent builder floor on Moulsari Avenue we net-meter directly against your own DHBVN connection, so it is a normal private rooftop job.
For a condominium tower the roof is shared, so it goes in as a society plant or virtual net metering with the association — two different structures for the same DLF Phase 3, scoped at survey.
Go Solar in DLF Phase 3
Get a free site survey and custom quote for your rooftop in DLF Phase 3, Gurugram.
