<link href="https://fonts.googleapis.com/css2?family=Inter:wght@300;400;500;600;700;800&display=optional" rel="stylesheet">
    24×7 Support

    Solar for Large Homes · Delhi NCR

    If Your Bill Is ₹25K+, You're Overpaying.

    Six ACs, 1,300 units a month, a ₹35K bill — that's a 20 kW solar problem, not a 5 kW one. Designed for Delhi NCR homes above 4,000 sqft. 3-phase ready, battery optional, senior project manager from day one.

    Large rooftop solar array on a modern Delhi NCR villa at sunset, Bridgeway engineer on site

    Pick Your Bill. See Your System.

    Honest sizing for 4,000+ sqft Delhi NCR homes — no upsell tables.

    System Size
    20 kW
    Roof Area
    1250 sqft
    Net Cost
    ₹10.22L
    After ₹78K subsidy
    Payback
    4.5 yr
    Saving ₹28,000–32,000/mo
    Panels
    34 panels
    Total Cost
    ₹11L
    Govt Subsidy
    ₹78K
    You Pay
    ₹10.22L
    25-yr Savings
    ₹51.10L

    Delhi & UP residents get an additional ₹30,000 state subsidy

    On top of the ₹78,000 central subsidy under PM Surya Ghar, Delhi and Uttar Pradesh offer an extra ₹30,000 — bringing your total subsidy to ₹1,08,000. Haryana offers ₹40,000.

    South Delhi · Anonymised

    A 6-AC Home, a ₹35,000 Bill, a 24 kW System

    Family of six. 1,300 units a month in summer. Six air conditioners, two refrigerators, two geysers, water pumps. They'd tried turning things off — bill never dropped below ₹28,000. We sized a 24 kW system, filed 3-phase net metering, commissioned in 28 working days.

    Before
    ₹35,000/mo
    After (month 1)
    ₹3,200/mo
    System size
    24 kW
    Payback
    ~4.5 yr

    Representative case based on published Delhi NCR installation data. Bridgeway customer numbers available on request.

    2026 Pricing

    Solar Panel Price in Delhi — by System Size

    Net cost after every government subsidy you qualify for in Delhi. No hidden charges.

    Verified 21 Jun 2026 · WhatsApp pricing sheet 2026-06-10 (String+1Ph<=5kW, String+3Ph>=6kW, GST-incl)Verified 10 Jul 2026 · Delhi govt solar policy

    1 kW System

    ₹36,230

    Gross ₹76,230 − subsidy ₹40,000~120 units/mo

    2 kW System

    ₹72,460

    Gross ₹1,52,460 − subsidy ₹80,000~240 units/mo

    3 kW System

    ₹1,20,690

    Gross ₹2,28,690 − subsidy ₹1,08,000~360 units/mo

    5 kW System

    ₹2,35,035

    Gross ₹3,43,035 − subsidy ₹1,08,000~600 units/mo

    10 kW System

    ₹5,22,000

    Gross ₹6,30,000 − subsidy ₹1,08,000~1200 units/mo

    Prices are typical residential rates inclusive of panels, inverter, structure, wiring & installation. Get exact quote for your bill

    Do You Need a Battery?

    Honest guidance. We won't sell you a 15 kWh battery if your area gets two outages a year.

    4+ hours daily power cuts
    → Add 10–15 kWh battery
    Reliable grid, rare outages
    → Skip battery, pure on-grid
    Elderly parents, medical loads
    → 10 kWh battery essential
    EV charging at home
    → Hybrid + 7.2 kW EV charger

    Everything's Included — No Surprises

    Large-system installs get a senior project manager, not a junior coordinator.

    3-Phase Site Survey + Shading

    Drone shadow analysis on 4,000+ sqft roofs, 3-phase load assessment

    Tier-1 Mono PERC, 580–620 Wp

    Premium TopCon panels, BIS-certified 3-phase inverters

    3-Phase ACDB/DCDB + LA Protection

    Higher-rated SPDs for 20+ kW systems, dual earthing as per IS/IEC

    Net Metering + Subsidy Filed

    DISCOM 3-phase net meter application — we handle the paperwork

    Project Manager Assigned

    Named senior consultant from survey to switch-on, on WhatsApp

    25-Year Panel Warranty

    Panels, inverter, mounting — and a no-roof-leak guarantee

    From Site Visit to Switch-On

    Typical timeline: 6–10 weeks. Most of the wait is DISCOM 3-phase processing.

    1

    Senior Site Visit

    Same week

    Senior consultant visits, measures roof, 3-phase load study, recommends 15/20/25 kW with options.

    2

    Installation

    3–5 days

    Larger systems take longer — panels mounted in rows, 3-phase wiring, ACDB/DCDB, earthing, structural checks.

    3

    3-Phase Net Meter Filing

    3–5 weeks

    We file with DISCOM + PM Surya Ghar subsidy portal. 3-phase approval takes a bit longer than single-phase.

    4

    Commissioning + Handover

    1–2 weeks

    Inspector visit, bi-directional meter installed, generation report walkthrough with you and your electrician.

    Real Questions From Big-Home Buyers

    Your Rooftop Is Losing Money Every Month

    Tell us about it — we'll show you exactly what solar saves you.

    We use this to confirm we serve your area.