Gurgaon · Residential · 2 kW
2 kW Solar Panel Price in Gurgaon (2026)
₹92,460 after ₹60k stacked subsidy. DHBVN net metering filed. 4 × 580 Wp panels, ~140 sqft of roof.

2 kW is the entry-point Gurgaon system — fits a 1-2 BHK builder-floor tenant or a compact owner-occupied flat with a ₹1,500-2,200 monthly bill. DHBVN approval at this size is straightforward: well below sanctioned load on every standard Gurgaon connection, no Form A-2 needed. PM Surya Ghar pays ₹60,000. Haryana has no state top-up as of 2026, so the central amount is the full subsidy. Four 580 Wp panels, ~140 sqft of clean roof. DHBVN processes 2 kW applications in 2-3 weeks once installation photos are uploaded.
Panels
4 × 580 Wp
Roof Area
~140 sqft
Daily Output
8 units
Monthly Saving
₹1,680
at ₹7/unit
2 kW Price Breakdown — Gurgaon
From gross system cost to what you actually pay.
Gross system cost (2 kW × ₹76,230/kW)
₹1,52,460
− PM Surya Ghar central subsidy
−₹60,000
− Haryana state subsidy
−₹0
Net cost in Gurgaon
₹92,460
Payback ~4.6 years at Gurgaon's avg ₹7/unit residential tariff.
2 kW with DHBVN
The discom-specific rules that decide whether your 2 kW system gets approved.
Net Metering Policy
DHBVN follows HERC 2021: 1:1 net metering up to sanctioned load for systems ≤ 500 kW. Settlement is monthly with annual carry-forward of surplus units.
HERC (Rooftop Solar Grid Interactive Systems) Regulations, 2021
Sanctioned Load Rule
Most Gurgaon residential connections are sanctioned at 3-5 kW single-phase. Anything above your sanctioned load needs Form A-2 load enhancement before the net-meter file moves.
Applies to all rooftop sizes including 2 kW
Haryana State Subsidy
Haryana has no active residential rooftop top-up subsidy as of 2026 — only the central PM Surya Ghar amount applies in DHBVN areas.
Verified for 2 kW in Gurgaon
The 2 kW gotcha in Gurgaon
Haryana removed its state rooftop top-up in 2023 and hasn't reinstated it. Don't quote-shop on the assumption of a ₹30k state subsidy — it doesn't exist in DHBVN areas.
From our recent installs
Is 2 kW right for your home?
Household profile
1 BHK or 2 BHK with light AC use
Current monthly bill
₹1,500 – ₹2,200
Inverter sizing
2 kVA single-phase
Roof context: Gurgaon splits cleanly: open builder floors in newer sectors (56-95) handle 5-10 kW comfortably; DLF/Sushant Lok plots have parapet and shadow constraints that push 3-5 kW as the sweet spot.
2 kW in Gurgaon — FAQs
Other sizes & cities
3 kW Solar Price in Gurgaon
3 kW system price in Gurgaon after PM Surya Ghar + state subsidy.
ExploreSolar Panel Price in Gurgaon
1-10 kW pricing in Gurgaon after PM Surya Ghar + state subsidy.
ExploreSolar in DLF Phase 1
DHBVN net metering after Rs.108K combined subsidy.
ExploreSolar in DLF Phase 2
DHBVN net metering after Rs.108K combined subsidy.
ExploreSolar in DLF Phase 4
DHBVN net metering after Rs.108K combined subsidy.
ExploreSolar in Golf Course Road
DHBVN net metering after Rs.108K combined subsidy.
Explore