24×7 Support

    Gurgaon · Residential · 10 kW

    10 kW Solar Panel Price in Gurgaon (2026)

    ₹5.52L after ₹78k stacked subsidy. DHBVN net metering filed. 18 × 580 Wp panels, ~650 sqft of roof.

    Verified 21 Jun 2026 · WhatsApp pricing sheet 2026-06-10 (String+1Ph<=5kW, String+3Ph>=6kW, GST-incl)Verified 2 Jul 2026 · Haryana govt
    10 kW rooftop solar system installed in Gurgaon

    10 kW is the sweet spot for independent Gurgaon houses on 300+ sq yd plots and large builder floors — DLF Phase 4-5, Sectors 56-95, South City, Sohna Road villas. Eighteen 580 Wp panels need ~650 sqft of clean roof and a 3-phase connection. DHBVN allows 1:1 net metering up to sanctioned load under HERC 2021 — no UPERC-style 10 kW residential cap, so the math holds at this size. PM Surya Ghar caps at ₹78,000, no Haryana top-up. Cost-per-kW drops 8-10% at 10 kW vs 3 kW, partially offsetting the absent state subsidy.

    Panels

    18 × 580 Wp

    Roof Area

    ~650 sqft

    Daily Output

    40 units

    Monthly Saving

    ₹8,400

    at ₹7/unit

    10 kW Price Breakdown — Gurgaon

    From gross system cost to what you actually pay.

    Gross system cost (10 kW × ₹63,000/kW)

    ₹6,30,000

    − PM Surya Ghar central subsidy

    −₹78,000

    − Haryana state subsidy

    −₹0

    Net cost in Gurgaon

    ₹5,52,000

    Payback ~5.5 years at Gurgaon's avg ₹7/unit residential tariff.

    DISCOM Rules

    10 kW with DHBVN

    The discom-specific rules that decide whether your 10 kW system gets approved.

    Net Metering Policy

    DHBVN follows HERC 2021: 1:1 net metering up to sanctioned load for systems ≤ 500 kW. Settlement is monthly with annual carry-forward of surplus units.

    HERC (Rooftop Solar Grid Interactive Systems) Regulations, 2021

    Sanctioned Load Rule

    Most Gurgaon residential connections are sanctioned at 3-5 kW single-phase. Anything above your sanctioned load needs Form A-2 load enhancement before the net-meter file moves.

    Applies to all rooftop sizes including 10 kW

    Haryana State Subsidy

    Haryana has no active residential rooftop top-up subsidy as of 2026 — only the central PM Surya Ghar amount applies in DHBVN areas.

    Verified for 10 kW in Gurgaon

    The 10 kW gotcha in Gurgaon

    10 kW requires a 3-phase connection. Many older Gurgaon houses are single-phase — add ₹20-30k and 3-4 weeks for DHBVN phase upgrade.

    From our recent installs

    Getting 10 kW approved with DHBVN

    1. Register on the PM Surya Ghar portal (pmsuryaghar.gov.in) with your CA number and pick your DISCOM.
    2. Sanctioned load check: 10 kW needs 10 kW sanctioned load and 3-phase; file Form A-2 load enhancement with DHBVN first.
    3. DHBVN gives technical feasibility for 10 kW under HERC 2021 net-metering rules.
    4. Installation by a DHBVN-empanelled vendor, then the net-meter application with the installation report.
    5. DHBVN inspection and bi-directional meter fitting; the system is commissioned.
    6. After commissioning, the central subsidy is credited to your bank account through the portal. Haryana adds no state top-up, so central is the only subsidy.

    What 10 kW means in Gurgaon

    With no Haryana top-up, every kW above 3 kW is paid in full. 10 kW fits Gurgaon houses on larger plots in newer sectors where the bill already runs ₹7,500 or more a month.

    Worked example: about 1200 units a month at ₹7/unit saves around ₹8,400 a month. On a net cost of ₹5,52,000, that pays back in about 5.5 years.

    Is 10 kW right for your home?

    Household profile

    Large independent house, builder floor with multiple ACs

    Current monthly bill

    ₹7,500 – ₹12,000

    Inverter sizing

    10 kVA 3-phase

    Roof context: Gurgaon splits cleanly: open builder floors in newer sectors (56-95) handle 5-10 kW comfortably; DLF/Sushant Lok plots have parapet and shadow constraints that push 3-5 kW as the sweet spot.

    10 kW in Gurgaon — FAQs