Gurgaon · Residential · 10 kW
10 kW Solar Panel Price in Gurgaon (2026)
₹5.52L after ₹78k stacked subsidy. DHBVN net metering filed. 18 × 580 Wp panels, ~650 sqft of roof.

10 kW is the sweet spot for independent Gurgaon houses on 300+ sq yd plots and large builder floors — DLF Phase 4-5, Sectors 56-95, South City, Sohna Road villas. Eighteen 580 Wp panels need ~650 sqft of clean roof and a 3-phase connection. DHBVN allows 1:1 net metering up to sanctioned load under HERC 2021 — no UPERC-style 10 kW residential cap, so the math holds at this size. PM Surya Ghar caps at ₹78,000, no Haryana top-up. Cost-per-kW drops 8-10% at 10 kW vs 3 kW, partially offsetting the absent state subsidy.
Panels
18 × 580 Wp
Roof Area
~650 sqft
Daily Output
40 units
Monthly Saving
₹8,400
at ₹7/unit
10 kW Price Breakdown — Gurgaon
From gross system cost to what you actually pay.
Gross system cost (10 kW × ₹63,000/kW)
₹6,30,000
− PM Surya Ghar central subsidy
−₹78,000
− Haryana state subsidy
−₹0
Net cost in Gurgaon
₹5,52,000
Payback ~5.5 years at Gurgaon's avg ₹7/unit residential tariff.
10 kW with DHBVN
The discom-specific rules that decide whether your 10 kW system gets approved.
Net Metering Policy
DHBVN follows HERC 2021: 1:1 net metering up to sanctioned load for systems ≤ 500 kW. Settlement is monthly with annual carry-forward of surplus units.
HERC (Rooftop Solar Grid Interactive Systems) Regulations, 2021
Sanctioned Load Rule
Most Gurgaon residential connections are sanctioned at 3-5 kW single-phase. Anything above your sanctioned load needs Form A-2 load enhancement before the net-meter file moves.
Applies to all rooftop sizes including 10 kW
Haryana State Subsidy
Haryana has no active residential rooftop top-up subsidy as of 2026 — only the central PM Surya Ghar amount applies in DHBVN areas.
Verified for 10 kW in Gurgaon
The 10 kW gotcha in Gurgaon
10 kW requires a 3-phase connection. Many older Gurgaon houses are single-phase — add ₹20-30k and 3-4 weeks for DHBVN phase upgrade.
From our recent installs
Getting 10 kW approved with DHBVN
- Register on the PM Surya Ghar portal (pmsuryaghar.gov.in) with your CA number and pick your DISCOM.
- Sanctioned load check: 10 kW needs 10 kW sanctioned load and 3-phase; file Form A-2 load enhancement with DHBVN first.
- DHBVN gives technical feasibility for 10 kW under HERC 2021 net-metering rules.
- Installation by a DHBVN-empanelled vendor, then the net-meter application with the installation report.
- DHBVN inspection and bi-directional meter fitting; the system is commissioned.
- After commissioning, the central subsidy is credited to your bank account through the portal. Haryana adds no state top-up, so central is the only subsidy.
What 10 kW means in Gurgaon
With no Haryana top-up, every kW above 3 kW is paid in full. 10 kW fits Gurgaon houses on larger plots in newer sectors where the bill already runs ₹7,500 or more a month.
Worked example: about 1200 units a month at ₹7/unit saves around ₹8,400 a month. On a net cost of ₹5,52,000, that pays back in about 5.5 years.
Is 10 kW right for your home?
Household profile
Large independent house, builder floor with multiple ACs
Current monthly bill
₹7,500 – ₹12,000
Inverter sizing
10 kVA 3-phase
Roof context: Gurgaon splits cleanly: open builder floors in newer sectors (56-95) handle 5-10 kW comfortably; DLF/Sushant Lok plots have parapet and shadow constraints that push 3-5 kW as the sweet spot.
10 kW in Gurgaon — FAQs
Other sizes & cities
5 kW Solar Price in Gurgaon
5 kW system price in Gurgaon after PM Surya Ghar + state subsidy.
ExploreBest Solar Companies in Delhi NCR
Eight verifiable checks to judge any installer — empanelment, scope, year-three cost.
ExploreSolar in DLF Phase 1
DHBVN net metering after Rs.78K combined subsidy.
ExploreSolar in DLF Phase 2
DHBVN net metering after Rs.78K combined subsidy.
ExploreSolar in DLF Phase 3
DHBVN net metering after Rs.78K combined subsidy.
ExploreSolar in DLF Phase 4
DHBVN net metering after Rs.78K combined subsidy.
Explore