<link href="https://fonts.googleapis.com/css2?family=Inter:wght@300;400;500;600;700;800&display=optional" rel="stylesheet">
    24×7 Support

    Noida · Residential · 3 kW

    3 kW Solar Panel Price in Noida (2026)

    ₹1.21L after ₹108k stacked subsidy. NPCL (Noida Power Company) net metering filed. 5 × 580 Wp panels, ~200 sqft of roof.

    Verified 21 Jun 2026 · WhatsApp pricing sheet 2026-06-10 (String+1Ph<=5kW, String+3Ph>=6kW, GST-incl)Verified 2 Jul 2026 · UPNEDA
    3 kW rooftop solar system installed in Noida

    3 kW is the most-installed size in Noida — fits 2-3 BHK builder floors in Sectors 50, 100, 150 and most RWA-approved high-rise rooftop slots. NPCL's net-metering process is the fastest in NCR for this size: 2-3 weeks end-to-end. PM Surya Ghar pays ₹78,000 (its 3 kW cap), UP adds ₹30,000 flat — stacked total ₹1,08,000, same as Delhi and Ghaziabad. Five 580 Wp panels, ~200 sqft of clean roof, ~360 units/month. UPERC's 10 kW residential net-metering cap applies but 3 kW is nowhere near it.

    Panels

    5 × 580 Wp

    Roof Area

    ~200 sqft

    Daily Output

    12 units

    Monthly Saving

    ₹2,520

    at ₹7/unit

    3 kW Price Breakdown — Noida

    From gross system cost to what you actually pay.

    Gross system cost (3 kW × ₹76,230/kW)

    ₹2,28,690

    − PM Surya Ghar central subsidy

    −₹78,000

    − Uttar Pradesh state subsidy

    −₹30,000

    Net cost in Noida

    ₹1,20,690

    Payback ~4 years at Noida's avg ₹7/unit residential tariff.

    DISCOM Rules

    3 kW with NPCL (Noida Power Company)

    The discom-specific rules that decide whether your 3 kW system gets approved.

    Net Metering Policy

    NPCL is the only private discom in NCR — net metering paperwork moves through NPCL's own portal, not UPPCL's. UPERC rules still apply: 1:1 up to 10 kW residential, gross-metering above.

    UPERC Rooftop Solar Regulations, 2019 (applied via NPCL)

    Sanctioned Load Rule

    NPCL processes load enhancement faster than UPPCL/PVVNL — typically 10-14 days vs 3 weeks. Sanctioned-load cap on rooftop kW still applies.

    Applies to all rooftop sizes including 3 kW

    Uttar Pradesh State Subsidy

    NPCL consumers are eligible for the UP state ₹30,000 flat top-up (the scheme is state-wide, not UPPCL-specific). Disbursed via the unified PM Surya Ghar portal.

    Verified for 3 kW in Noida

    The 3 kW gotcha in Noida

    High-rise societies in Noida need an RWA NOC before NPCL accepts the net-metering application. We draft and chase the RWA letter alongside the file.

    From our recent installs

    Is 3 kW right for your home?

    Household profile

    2-3 BHK with 1-2 ACs running 6-8 hours

    Current monthly bill

    ₹2,200 – ₹3,500

    Inverter sizing

    3 kVA single-phase

    Roof context: Independent plots in Sectors 50, 100, 150 have clean open roofs. High-rise societies need RWA NOC before rooftop installation — we handle the RWA paperwork in parallel.

    3 kW in Noida — FAQs