    Noida · Residential · 5 kW

    5 kW Solar Panel Price in Noida (2026)

    ₹2.35L after ₹108k stacked subsidy. NPCL (Noida Power Company) net metering filed. 9 × 580 Wp panels, ~350 sqft of roof.

    Verified 21 Jun 2026 · WhatsApp pricing sheet 2026-06-10 (String+1Ph<=5kW, String+3Ph>=6kW, GST-incl)Verified 2 Jul 2026 · UPNEDA
    5 kW rooftop solar system installed in Noida

    5 kW is where Noida independent plots (Sectors 50, 100, 150) hit their sweet spot — large enough to offset ₹4,000-6,500 monthly bills, small enough to stay under UPERC's 10 kW residential net-metering cap. Nine 580 Wp panels, ~350 sqft of clean roof. NPCL processes 5 kW applications in 3 weeks. May need Form A-2 load enhancement if your sanctioned load is below 5 kW — NPCL is faster on enhancement than UPPCL (10-14 days vs 3 weeks). PM Surya Ghar caps at ₹78,000, UP adds ₹30,000 flat.

    Panels

    9 × 580 Wp

    Roof Area

    ~350 sqft

    Daily Output

    20 units

    Monthly Saving

    ₹4,200

    at ₹7/unit

    5 kW Price Breakdown — Noida

    From gross system cost to what you actually pay.

    Gross system cost (5 kW × ₹68,607/kW)

    ₹3,43,035

    − PM Surya Ghar central subsidy

    −₹78,000

    − Uttar Pradesh state subsidy

    −₹30,000

    Net cost in Noida

    ₹2,35,035

    Payback ~4.7 years at Noida's avg ₹7/unit residential tariff.

    DISCOM Rules

    5 kW with NPCL (Noida Power Company)

    The discom-specific rules that decide whether your 5 kW system gets approved.

    Net Metering Policy

    NPCL is the only private discom in NCR — net metering paperwork moves through NPCL's own portal, not UPPCL's. UPERC rules still apply: 1:1 up to 10 kW residential, gross-metering above.

    UPERC Rooftop Solar Regulations, 2019 (applied via NPCL)

    Sanctioned Load Rule

    NPCL processes load enhancement faster than UPPCL/PVVNL — typically 10-14 days vs 3 weeks. Sanctioned-load cap on rooftop kW still applies.

    Applies to all rooftop sizes including 5 kW

    Uttar Pradesh State Subsidy

    NPCL consumers are eligible for the UP state ₹30,000 flat top-up (the scheme is state-wide, not UPPCL-specific). Disbursed via the unified PM Surya Ghar portal.

    Verified for 5 kW in Noida

    The 5 kW gotcha in Noida

    UPERC's 10 kW residential cap is firm — at 5 kW you have headroom, but the rule matters if you later expand. Plan inverter sizing accordingly.

    From our recent installs

    Is 5 kW right for your home?

    Household profile

    3-4 BHK with 2-3 ACs, geysers, full appliance load

    Current monthly bill

    ₹4,000 – ₹6,500

    Inverter sizing

    5 kVA single-phase or 3-phase

    Roof context: Independent plots in Sectors 50, 100, 150 have clean open roofs. High-rise societies need RWA NOC before rooftop installation — we handle the RWA paperwork in parallel.

    5 kW in Noida — FAQs