<link href="https://fonts.googleapis.com/css2?family=Inter:wght@300;400;500;600;700;800&display=optional" rel="stylesheet">
    24×7 Support

    Ghaziabad · Residential · 5 kW

    5 kW Solar Panel Price in Ghaziabad (2026)

    ₹2.35L after ₹108k stacked subsidy. PVVNL (UPPCL) net metering filed. 9 × 580 Wp panels, ~350 sqft of roof.

    Verified 21 Jun 2026 · WhatsApp pricing sheet 2026-06-10 (String+1Ph<=5kW, String+3Ph>=6kW, GST-incl)Verified 2 Jul 2026 · UPNEDA
    5 kW rooftop solar system installed in Ghaziabad

    5 kW is a sweet spot for Ghaziabad independent houses — bigger rooftops than Delhi means 350 sqft is easy, and at ₹4,000-6,500 monthly bills the payback lands inside 4 years. Still under UPERC's 10 kW residential cap, so 1:1 net metering applies. PM Surya Ghar caps at ₹78,000 and UP adds ₹30,000 flat. Nine 580 Wp panels, 5 kVA inverter (single-phase still works at this size in most Ghaziabad sanctioned loads). PVVNL is fine with 5 kW on a standard residential connection as long as sanctioned load supports it.

    Panels

    9 × 580 Wp

    Roof Area

    ~350 sqft

    Daily Output

    20 units

    Monthly Saving

    ₹4,200

    at ₹7/unit

    5 kW Price Breakdown — Ghaziabad

    From gross system cost to what you actually pay.

    Gross system cost (5 kW × ₹68,607/kW)

    ₹3,43,035

    − PM Surya Ghar central subsidy

    −₹78,000

    − Uttar Pradesh state subsidy

    −₹30,000

    Net cost in Ghaziabad

    ₹2,35,035

    Payback ~4.7 years at Ghaziabad's avg ₹7/unit residential tariff.

    DISCOM Rules

    5 kW with PVVNL (UPPCL)

    The discom-specific rules that decide whether your 5 kW system gets approved.

    Net Metering Policy

    UPERC allows 1:1 net metering up to 10 kW for residential rooftops. Systems above 10 kW move to gross-metering, which changes the payback math significantly.

    UPERC (Rooftop Solar PV Grid Interactive Systems) Regulations, 2019

    Sanctioned Load Rule

    PVVNL caps rooftop capacity at sanctioned load. Load enhancement takes 2-3 weeks and a one-time security deposit.

    Applies to all rooftop sizes including 5 kW

    Uttar Pradesh State Subsidy

    UP state top-up of ₹30,000 (flat) stacks on PM Surya Ghar via the unified PM Surya Ghar portal — no separate application.

    Verified for 5 kW in Ghaziabad

    The 5 kW gotcha in Ghaziabad

    Above 5 kW, PVVNL prefers 3-phase connections. Single-phase 5 kW works but inverter options are narrower.

    From our recent installs

    Is 5 kW right for your home?

    Household profile

    3-4 BHK with 2-3 ACs, geysers, full appliance load

    Current monthly bill

    ₹4,000 – ₹6,500

    Inverter sizing

    5 kVA single-phase or 3-phase

    Roof context: Ghaziabad plots are more open than central Delhi — independent houses commonly have 500-1200 sqft of usable roof, so 5-10 kW is realistic.

    5 kW in Ghaziabad — FAQs