    The first Virtual Net Metering solar plant under BRPL in Delhi

    A 21.60 kW rooftop plant at a residential site in Delhi, splitting its generation across three separate BSES Rajdhani electricity meters — 50%, 40% and 10%. Reported by four industry publications in November 2024.

    Plant capacity

    21.60 kW

    Meters served

    3 (50 / 40 / 10)

    Technology

    Bi-facial panels + micro-inverters

    DISCOM

    BSES Rajdhani (BRPL)

    How the 50 / 40 / 10 split works

    One plant, one generation meter — and three beneficiary connections registered with the DISCOM. Each month, the units the plant exports are apportioned in the ratio agreed at sanction, and each connection sees its share as credited units on its own bill. No wires run between the properties; the sharing happens in the utility's billing system.

    50%

    Primary meter

    40%

    Secondary meter

    10%

    Third meter

    Synchronising with the DISCOM

    The engineering was the easy half. Because no VNM plant had been energised under BRPL before, the allocation had to be established connection by connection: every beneficiary meter identified, consent recorded, the share ratio sanctioned, and the plant synchronised and net-metered before credits could begin flowing. Our founder described the work as navigating complex policy and regulatory requirements to build a model that others can now repeat.

    • All beneficiary connections must sit under the same distribution licensee — here, BRPL.
    • The share ratio is fixed at sanction and applied by the utility each billing cycle.
    • Bi-facial modules and micro-inverters were used for yield and per-module reliability.
    • Credits appear on each beneficiary's own BSES bill, not as a transfer between owners.

    Questions about this project

    What makes this project a first?

    It is the first Virtual Net Metering solar plant installed under BSES Rajdhani Power Limited (BRPL) in Delhi, reported by pv magazine India, Energetica India, Saur Energy and EQ Magazine in November 2024.

    How is the generation shared across three meters?

    The 21.60 kW plant's output is allocated 50% to the primary meter, 40% to a secondary meter and 10% to a third meter. The allocation is registered with the DISCOM, so each meter receives its share as credits on its own electricity bill.

    Do all three meters have to be at the same address?

    No. Virtual Net Metering allows generation from one plant to be credited to other service connections, provided they fall under the same distribution licensee. In this project the connections sit under BRPL.

    Who can replicate this model?

    The press coverage notes the model suits residential complexes, business parks, educational institutions and any owner holding multiple connections under the same utility.

    What savings did this project deliver?

    We do not publish savings figures for this site. The published sources carry no billing data, and we will not estimate one. Ask our team for a site-specific projection based on your own tariff and consumption.

    Multiple meters under one DISCOM?

    Send us your connection details and we'll tell you whether Virtual Net Metering applies to them — and what the allocation would look like.