24×7 Support

    Solar O&M Services

    Third-party O&M for EPCs and C&I solar plants.

    The boring, unsexy work that keeps a 100 kW rooftop running at >95% PR for 25 years. Performance-linked SLAs, monthly investor-ready reports, every warranty claim filed for you.

    PR-linked SLA Monitoring integrated Spares stocked White-label for EPCs
    Bridgeway O&M engineer auditing a commercial rooftop solar plant

    Built for three buyers

    If your business depends on a solar plant running, this page is for you.

    EPCs sub-contracting AMC

    Won the install, no bandwidth for 5-year AMC obligations? We run O&M under your brand, you keep the customer. White-label reports, your SLA terms.

    C&I asset owners

    Factory, hospital, university or RWA rooftop sitting at 70% of design? We benchmark, fix, and lift it to >95% uptime — with monthly numbers you can audit.

    IPPs & RESCO operators

    Multi-site portfolios across NCR + adjoining states. Single SLA, single ticketing portal, one quarterly review — instead of chasing 12 vendors.

    What our SLA covers

    Every number on the report is something we contractually own.

    Performance Ratio (PR) tracking

    Monthly PR vs design baseline. Underperformance auto-flagged on day 7.

    Inverter & string monitoring

    Modbus / cloud portal integration. Every string read, every fault logged.

    Response SLA

    On-site within 24 hours for critical faults across NCR. 48 hours pan-India.

    Generation reports

    Monthly kWh, PR, DGR, soiling loss, downtime. Investor-ready format.

    Preventive maintenance

    Quarterly torque, thermography, earthing & MPPT health. Spares tracked.

    Warranty management

    Serial-level tracking. We file every claim — Sungrow, SolarEdge, Enphase, Huawei, Solis.

    How an O&M engagement starts

    From first call to first monthly report — four steps, no surprises.

    01

    Plant audit

    We walk the site, pull the inverter logs, benchmark PR. Scope sheet in 5 working days.

    02

    SLA contract

    PR floor, response time, escalation matrix. Performance-linked or fixed-fee, your choice.

    03

    Onboarding

    Monitoring integration, spare-parts list, baseline thermography. Live inside 2 weeks.

    04

    Monthly cycle

    Preventive visits, performance report, joint review. Quarterly business review with your CFO.

    EPCs: keep the install. Hand us the AMC.

    Most EPCs lose money on the 5-year AMC because the field cost is bigger than the line item. We run it under your brand, you keep margin and the customer relationship — and never get woken up at 2 a.m. about an inverter trip.

    Honest answers

    What every EPC and asset owner asks before signing an O&M contract.

    Talk to our O&M team

    EPCs sub-contracting AMC, IPPs hunting an uptime partner, C&I owners chasing PR — we respond inside one business day.