    Uttar Pradesh Solar Subsidy 2026: PM Surya Ghar + UP State Top-Up

    The Uttar Pradesh solar subsidy for 2026 stacks the central PM Surya Ghar Muft Bijli Yojana (up to Rs. 78,000) with the UP state additional subsidy of Rs. 30,000, for a maximum residential rooftop incentive of Rs. 1,08,000 on a 3 kW system. The scheme is administered by UPNEDA in coordination with DISCOMs (PVVNL, MVVNL, DVVNL, PuVVNL, KESCO).

    Last verified: 20 Mar 2026Verified by Bridgeway Power

    Stacked subsidy by system size — UP residential consumers, 2026

    Source: Bridgeway Power facts registry · Last verified 20 Mar 2026

    1 kW system
    Rs. 30,000 (central) + Rs. 15,000 (UP state) = Rs. 45,000
    2 kW system
    Rs. 60,000 (central) + Rs. 30,000 (UP state) = Rs. 90,000
    3 kW system (cap)
    Rs. 78,000 (central) + Rs. 30,000 (UP state) = Rs. 1,08,000
    Above 3 kW
    Subsidy capped at Rs. 1,08,000 total
    Additional kW funded by consumer
    DISCOMs covered
    PVVNL (Noida, Ghaziabad, Meerut), MVVNL (Lucknow), DVVNL (Agra), PuVVNL (Varanasi), KESCO (Kanpur)
    Payment mode
    Direct Benefit Transfer (DBT) to consumer's bank account
    Disbursal timeline
    30-45 days post net-meter commissioning
    Eligibility
    Residential connection, valid Aadhaar, rooftop ownership / RWA NOC

    How to claim the UP solar subsidy (5 steps)

    1. 01

      Register on PM Surya Ghar portal

      Apply at pmsuryaghar.gov.in with DISCOM, consumer number and Aadhaar. UP state top-up is auto-attached via UPNEDA mapping.

    2. 02

      DISCOM technical feasibility

      PVVNL / MVVNL / DVVNL / PuVVNL / KESCO inspects rooftop and approves system size. 10-21 days, slower than Delhi.

    3. 03

      Installation by UPNEDA-empanelled vendor

      Only UPNEDA-empanelled vendors qualify for subsidy. Bridgeway is empanelled across PVVNL territory (Noida, Ghaziabad, Meerut).

    4. 04

      Net meter installation

      DISCOM installs the bidirectional net meter and issues commissioning. 15-30 days, varies by DISCOM.

    5. 05

      Subsidy credited via DBT

      Central + UP state subsidy arrive together in the consumer's bank account within 30-45 days of commissioning.